{"id":6345,"date":"2024-12-26T10:51:05","date_gmt":"2024-12-26T09:51:05","guid":{"rendered":"https:\/\/www.redmedcapital.com\/?p=6345"},"modified":"2025-03-11T10:58:26","modified_gmt":"2025-03-11T09:58:26","slug":"hydrogene-vert-projet-chbika-de-totalenergies-h2-2eme-reunion-du-comite-de-suivi-a-guelmim","status":"publish","type":"post","link":"https:\/\/sitebackup.redmedcapital.com\/en\/2024\/12\/26\/hydrogene-vert-projet-chbika-de-totalenergies-h2-2eme-reunion-du-comite-de-suivi-a-guelmim\/","title":{"rendered":"Green Hydrogen Project \u00ab Chbika \u00bb by TotalEnergies H2: 2nd Monitoring Committee Meeting in Guelmim"},"content":{"rendered":"<section class=\"l-section wpb_row height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row type_default valign_top\"><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><div class=\"vc_col-sm-8 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-image style_shadow-1 align_center animate_fade\" style=\"animation-delay:1s\"><div class=\"w-image-h\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/Chbika-600x400.webp\" class=\"attachment-us_600_400_crop size-us_600_400_crop\" alt=\"\" srcset=\"https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/Chbika-600x400.webp 600w, https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/Chbika-300x200.webp 300w, https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/Chbika.webp 800w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/div><\/div><div class=\"w-separator size_medium\"><\/div><div class=\"wpb_text_column\" ><div class=\"wpb_wrapper\"><h2 style=\"text-align: justify;\">The second meeting of the project monitoring committee led by the consortium TotalEnergies, CIP, and A.P. M\u00f8ller Capital was held in Guelmim. The \u00ab H2 Chbika \u00bb project marks a first step in implementing Morocco&#8217;s Green Hydrogen Offer.<\/h2>\n<p style=\"text-align: justify;\">Following the signing on October 28, under the presidency of King Mohammed VI and French President Emmanuel Macron, <strong><a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/enoff\/mega-projet-de-total-eren-au-maroc-patrick-pouyanne-signe-un-accord-avec-le-royaume-pour-lhydrogene-vert\/\">of the first contract for the development of green hydrogen in Morocco<\/a><\/strong>, Karim Zidane, Minister Delegate in charge of Investment, Convergence, and Policy Evaluation, chaired the second meeting of the project monitoring committee in Guelmim, as reported.<\/p>\n<p style=\"text-align: justify;\">The meeting was attended by the Wali of the region, Mohamed Najem Abhay, and the President of the Regional Council, Mbarka Bouaida. Eric Festa, Executive Vice President of the TotalEnergies H2 (TE H2) subsidiary, was supported by <a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/2022\/09\/22\/avec-total-eren-et-cip-abdeslam-ababou-court-deux-lievres-a-la-fois-dans-lhydrogene-vert\/\"><strong>investment banker Abdeslam Ababou from Red Med Capital<\/strong><\/a>.<\/p>\n<blockquote>\n<p><em>&#8220;During this meeting, significant progress was validated for the implementation of the project, in line with Morocco&#8217;s Green Hydrogen Offer&#8221;, <\/em>assure-t-on.<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">The &#8220;<strong>H2 Chbika<\/strong>&#8221; project marks a first step in <a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/encontinu\/hydrogene-vert-et-offre-maroc-40-demandes-de-projets-recues-par-masen-comite-de-pilotage\/\"><strong>implementing Morocco&#8217;s Green Hydrogen Offer<\/strong><\/a>, aiming to position the Kingdom as a global leader in renewable energy and sustainable development.<\/p>\n<p>Planned <strong><a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/2022\/01\/25\/total-eren-investit-100-milliards-de-dirhams-dans-lhydrogene-et-lammoniac-verts-au-maroc\/\">since January 2022<\/a><\/strong>, the <a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/grandangle\/hydrogene-vert-au-maroc-les-details-du-mega-projet-de-total-eren-a-tilemzoune\/\"><strong>TotalEnergies H2 green hydrogen mega-project in Tilemzoune<\/strong><\/a> was finally set into motion in Morocco. After signing the preliminary land reservation contract with Rabat, the French energy giant was preparing to launch pre-project studies, albeit with a program currently more modest than initially planned (1 GW instead of the originally envisioned 10 GW), <strong><a style=\"color: red;\" href=\"https:\/\/ledesk.ma\/enclair\/projet-h2-chbika-phase-1-ou-reduction-de-voilure-pour-totalenergies-au-maroc\/\">as analyzed by Le Desk<\/a><\/strong>.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row height_small width_full with_overlay\"><div class=\"l-section-overlay\" style=\"background: #f5f5f5\"><\/div><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row type_default valign_top\"><div class=\"vc_col-sm-12 wpb_column vc_column_container animate_afb\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"g-cols wpb_row  type_default valign_middle vc_inner\"><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><h3 class=\"w-text us_custom_1f257949\"><span class=\"w-text-h\"><span class=\"w-text-value\">What the press says about us<\/span><\/span><\/h3><\/div><\/div><\/div><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"w-image align_center animate_afb\" style=\"animation-delay:0.2s\"><a href=\"https:\/\/fr.le360.ma\/entreprise\/m-tower-une-nouvelle-icone-architecturale-de-mfadel-group-et-red-med-real-estate-au-coeur-de_HQSBE7ECNVHJFDBMCW4KOCRXK4\/\" aria-label=\"Link\" class=\"w-image-h\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"200\" src=\"https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/desk-1024x200.png\" class=\"attachment-large size-large\" alt=\"desk rmc\" srcset=\"https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/desk-1024x200.png 1024w, https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/desk-300x59.png 300w, https:\/\/sitebackup.redmedcapital.com\/wp-content\/uploads\/2024\/12\/desk.png 1604w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/div><\/div><\/div><\/div><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><div class=\"vc_col-sm-2 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>","protected":false},"excerpt":{"rendered":"The second meeting of the project monitoring committee led by the consortium TotalEnergies, CIP, and A.P. M\u00f8ller Capital was held in Guelmim. The \u00ab H2 Chbika \u00bb project marks a first step in implementing Morocco&#8217;s Green Hydrogen Offer. Following the signing on October 28, under the presidency of King Mohammed VI and French President Emmanuel...","protected":false},"author":3,"featured_media":6107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-6345","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/posts\/6345","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/comments?post=6345"}],"version-history":[{"count":7,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/posts\/6345\/revisions"}],"predecessor-version":[{"id":6539,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/posts\/6345\/revisions\/6539"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/media\/6107"}],"wp:attachment":[{"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/media?parent=6345"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/categories?post=6345"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sitebackup.redmedcapital.com\/en\/wp-json\/wp\/v2\/tags?post=6345"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}